Accounting
cost overrun contingency
Turkish: Maliyet Aşımı Karşılığı (Cost Overrun Contingency)
English Definition
A reserve amount or committed additional financing line set aside within a project budget or financing structure to absorb unforeseen cost increases. The calibration of the component is a balancing problem: set too small, the project runs out of funds in an overrun; set too large, commitment fees accrue on idle capital and erode the return. Lenders often structure this contingency as a separate drawable facility and condition its use on the independent engineer's approval; from the sponsor's perspective, under what conditions and with what priority the contingency can be drawn directly determines the risk of an additional capital call.
Türkçe Tanım
Bir proje bütçesinde ya da finansman yapısında, öngörülemeyen maliyet artışlarını karşılamak üzere ayrılan rezerv tutar ya da taahhüt edilmiş ek finansman hattıdır. Bileşenin kalibrasyonu bir denge sorunudur: fazla küçük tutulursa aşımda proje fonsuz kalır, fazla büyük tutulursa atıl sermaye üzerinde taahhüt komisyonu birikir ve getiriyi eritir. Kredi verenler bu karşılığı çoğunlukla ayrı bir çekilebilir kolaylık olarak yapılandırır ve kullanımını bağımsız mühendisin onayına bağlar; sponsor açısından karşılığın hangi koşulda ve hangi öncelikle çekilebileceği, ek sermaye çağrısı riskini doğrudan belirler.